Electric railway drawing changes the GZMCW that electric place deploys intelligence is high frequency system of switch power source, include module of commutate of high frequency switch, a powerful person to charge pattern lead plane of monitoring of personal computer of ark of feed of airtight lead acerbity accumulator, dc, WJ2000 and each function unit, although equipment is not much, but it blocks one side alone however, it is stability of power supply of safeguard contact net and successional important equipment. The stand or fall that these equipment defend, matter to GZMCW intelligence not only the dependability of system of power source of high frequency switch and life, and what involve electrified wire netting directly is smooth move. Visible, safeguard and use good GZMCW intelligence system of power source of high frequency switch is very important.
1, use main demand and note:
GZMCW intelligence is high frequency system of switch power source, its intelligence changes rate tall, batteries uses a powerful person to charge pattern airtight lead acerbity accumulator, although gave us to bring a lot of advantage, but the following respects should note in use process, use security in order to ensure.
● inputs power source reliably. Change to assure electric place the dependability of system of direct current source, two conditional alternating current source that should introduce two communication to input power source and use screen ark to go up as far as possible are automatic the function of rearrange; To reduce harmonic interference, had better use the communication that introduces 10KV from the place to input power source as far as possible.
● is familiar with the technical data such as the manual with random and accessary equipment. Was familiar with these file data only, ability undertakes correctly use.
Component of equipment of backup of ● reasonable configuration; Want to often check an analysis to run parameter, forecast the time of breakdown happening and position, make meddlesome reason forecast, discover blemish eliminates in time. After investment of ark of direct current source moves, to the job of equipment the state should note the following respect: Origin: WWw.tede.cn
The input of alternating current source----Sequence of the voltage that inputs power source, appearance, whether be short of photograph and the box that prevent thunder has wait without the problem.
Shed output continuously----The system sheds circumstance of the voltage of output, electric current continuously.
Module of commutate of high frequency switch----The condition of each indicator light on face plate; LED expresses the indication of the head; Switch position; Accept the position of plug-in unit, receive insert firm.
Accumulator group----The upright voltage of batteries and batteries charging current and charge the way that run.
Previous12 Next
Position:home>Equipment maintenance >How be safeguarded and use good drawing to change the GZMCW of electric place in